In March of 2014, I stopped sailing the boat so that I could tackle the more major refit projects.The following, in chronological order, is the second set of refit journal entries from March 2015 through the present.


Thursday, March 5, 2015

Refit Video - Episode 4

If the box above doesn't have the video, you can link to it directly at YouTube here:
https://www.youtube.com/watch?v=vTq0lij4fIY


Wednesday, March 18, 2015


Refit Video - Episode 5

 

If the box above doesn't have the video, you can link to it directly at YouTube here:  http://youtu.be/aYAzJExxH_g
 



Saturday, April 4, 2015

Vacuum Obituary #2

In not-so-loving memory...

Vacuum # 2 lived and worked a mere 2.3% of the time Shop Vac, whose obituary is here, lived and worked. Vacuum # 2 was definitely not faithful or assertive. Gritty, yes, in a timorous sort of way. Alas, it was laid to rest at the bottom of a big dumpster, now covered with paint cans and moldy bunk cushions. So be it.

Kuewa's bottom is sanded to a near perfect finish and was washed with water and scrubber. After the round of rain that is on its way clears out, I will wipe down with acetone and then apply one coat a day of epoxy barrier coat for five days.

The new stainless steel water tank is near completion and yesterday I moved the traveler horse from the welding shop to the electro polishers. This process creates an anti-corrosive and more attractive finish on the stainless by removing iron molecules from a thin layer of the surface, leaving behind the chromium and nickle. Pretty slick, and a lot cheaper than having the welding shop polish with compound and electric tool for two days.


Tuesday, April 7, 2015


Refit Video - Episode 6


If the box above doesn't have the video, you can link to it directly at YouTube here: https://www.youtube.com/watch?v=TuWGXx26oL4


Monday, May 8, 2015

Refit Video - Episode 7

Episode 7 shows an innovative use of an old boat, installing the traveler horse, preparing the water tank and lifting it into place. There is a significantly longer version of how the tank was lifted and maneuvered into place here.


If the box above doesn't have the video, you can link to it directly at YouTube here:  https://youtu.be/Vbt8a_cE1VA



Saturday, June 13, 2015


Refit Video - Episode 8 

Episode 8 covers applying two-part foam around the fresh water tank, fiberglassing in the top section of the tank, moving the new engine into position and beginning the engine bed design. There is also a clip showing the neighbor airplane departing and more Volvo Ocean Race scenes. The all-woman team won leg 8 from Lisbon to Lorient, France, close-hauled up the vicious Bay of Biscay. Go SCA!



If the box above doesn't have the video, you can link to it directly at YouTube here:  https://youtu.be/D8wc4x-l4U4



Monday, August 3, 2015

Refit Video - Episode 9


This episode covers building the new engine beds and finally bolting the engine in place. I'd never start these projects if I knew how long everything was going to take and how many stumbling blocks there would be. I guess humans are mostly optimistic by nature. But it's all still fun and moving forward.

 

If the box above doesn't have the video, you can link to it directly at YouTube here: https://www.youtube.com/watch?v=kU-wQQnjY0M




Thursday, October 1, 2015

Refit Video - Episode 10


Overcoming two iterations of the new propeller shaft and engine alignment challenges, the engine goes in for the eighth and hopefully final time, gets bolted down, and all the systems attached and made operational. The episode ends with a clip from the Gitana Group testing their new 60' foiling monohull.


If the box above doesn't have the video, you can link to it directly at YouTube here: https://www.youtube.com/watch?v=fE4qprbpFhU


 

Thursday, February 25, 2016

Refit Video - Episode 11

This episode covers replacing the old teak cockpit coamings with Core Cell foam and fiberglass to make it completely waterproof and maintenance-free. The forward ends were also raised up for greater spray protection and a nice backrest.


Friday, July 15, 2016

Refit Video - Episode 12

The cockpit coaming is finally finished, some new blisters repaired on the rudder, some bovine contemplation, bottom sanding and painting, and LAUNCH!



Friday, January 27, 2017

Refit Video - Episode 13

Starting in-the-water work, rebuilding the companionway hatch, but going sailing a lot, too, which interferes with progress. But the new mast is ordered and in progress. At this writing, the machining is complete and the mast is off to the anodizer. Kuewa has sailed 247 miles since launching from Napa Valley Marina.


Saturday, March 10, 2018

Refit Video - Episode 14

At long last, here's an update on Kuewa's ongoing refit. A new short bow sprit and new mast are installed, and there are some scenes of my volunteer work at the Marine Mammal Center in Sausalito.